What conditions need to be met to install private charging piles?It mainly includes the following points: 

There are fixed parking spaces (property rights, leasing): Installing charging piles requires fixed parking spaces, and if it is an underground parking space, it is also necessary to confirm whether there is a good network signal. 


1.Install the charging pile

Agree to install in the community: The installation of charging piles also obtains the consent of the community property, and the car is mainly to communicate with the property in advance to understand the situation and prepare the corresponding materials as required. 

Meet the power conditions: whether the parking lot can be powered on, whether the power conditions of the community can be met, etc., these also need to be confirmed with the property in advance. 


2. What is the process of installing charging piles? The charging pile installation process mainly includes three steps: the property agrees to install the meter and install the charging pile. 

Install charging piles 

After the construction is completed, the charging pile service provider needs to report to the power company, and the power company will go to the site for acceptance, inspect the charging equipment and charging conditions, and confirm that the charging equipment can operate normally and will not affect other electrical equipment. 


3. How do I apply for a new energy meter? 

After confirming the charging conditions, you need to apply for a new energy meter, so how to apply for a new energy meter? Generally, after signing the car purchase contract, you can apply by telegram to the local power supply company by yourself or entrust the 4S store, and after the power supply company replies to the power supply plan, you can go through the procedures with the power supply company within the validity period. 

The installation process is slightly different in different places, and the general process is as follows: confirm the installation conditions, apply for a new energy meter survey site, issue a plan, receive materials, and accept the installation.

The owner should provide the following information:

(1) Electricity application form;

(2) the customer is valid and clear;

(3) Certificate of property rights of fixed parking spaces or permission certificates of property rights units;

(4) The sub-district office or property issues proof of consent to the use of charging and swapping facilities and external line access construction;

(5) Technical parameters and materials of the charging pile, (in addition to the above materials, other materials required by the power supply company need to be provided, which shall be handled by the business hall) 


4. How to charge for charging pile installation? 

The installation cost of charging piles is mainly divided into the construction cost and cable material cost paid by the installer during the installation process. 

The specific cost of charging pile installation depends on the specific situation, the installation environment is simple, and the cost is less if there are fewer cables, but if the environment is complex, the cable length costs more, as for the specific cost, there will be some differences in each place.

Generally speaking, the charging pile installation service provided with the vehicle is free within 30 meters of the charging line, and there will be additional construction costs beyond 30 meters.


Therefore, it is recommended that car owners inspect their parking Spaces in advance, design short circuits to reduce installation costs. Generally, there are many distribution rooms in residential areas, so homeowners should choose those close to the parking Spaces. This can save a lot of costs during installation


CATEGORIES

CONTACT US

Contact: Steven Chan

Phone: +86-15201824372

E-mail: zihengc56@gmail.com

Add: Caobao Road, Minhang District, Shanghai